Based on the information you provided, the Konnect3D Savings Calculator will estimate your potential savings in three key areas: labor costs, material costs, and time savings.
Better material tracking ensures on-time delivery and minimizes wastage. This results in an estimated 5% savings on your total material costs by reducing delays and inefficiencies in material management.
With Konnect3D’s real-time tracking, your project can be completed 20% faster, which means lower labor costs. This saves you significant money by reducing idle time and improving productivity
With improved coordination, your project finishes faster. By saving 27 days on your timeline, you avoid penalties, which are typically charged at $20,000 per day. This results in significant time-related cost savings.
This is the total amount you could save by using Konnect3D for your project. It includes labor, material, and time savings.
The figures are based on indicative rates selected and are for illustrative purposes only. Rates are subject to change. The computations is based on simulated figures and a number of underlying assumptions