For Project Directors

Computable Change. Traceable Decisions.

The first truly computable project execution system.

B₀Baseline#a3f2c8Δ1Rev-001Δ2Rev-002Δ3Rev-003ApprovedPendingreview req.MergeRejectedrollbackB₁New Baseline#7d4e1bHEAD

Computable Management of Change

Apply software engineering principles to physical engineering. Baselines, branching, and merge requests — for real-world assets.

Powered byHow It Works →
Branches
baseline/master
2 commits
moc/042-cooling-pump-upgrade
2 commits
Merge RequestMR-142

MOC-042: Upgrade Cooling Water Pump P-204A

openJ. Doe wants to merge into baseline/master from moc/042-cooling-pump-upgrade

DEXPI parser identified a larger capacity pump (P-204A) in the latest P&ID revision. Automatically extracted new parameters and connections. Requesting technical review before merging into the baseline digital twin.

3Modified
1Added
2Connections
2Commits
Reviewers
SJS. JenkinsApproved
KMK. MurphyPending

Schedule Control & 4D Simulation

Visualize your project timeline in 4D. Detect schedule variance before it becomes a delay. Predict, don't react.

Powered byExplore AI Scoring →
Schedule Control — FPSO Symphony
0.94SPI
1.02CPI
$4.2BEAC
-12 daysVariance
JFMAMJJASOND
Baseline
Actual
Engineering
87%
Procurement
62%
Construction
34%

Lifecycle Continuity

Data flows seamlessly from FEED through EPC into Operations. The Digital Thread is never broken at handover points.

Powered bySee Data Fusion →
Medallion Pipeline — Area 4
🔩BronzeRaw DEXPI3,241 tags
SilverValidated2,980 tags12 rules ✓
GoldTrusted2,980 tagsGraph-ready
Recent Processing91%
261 duplicates removed
14 orphan tags flagged
ISO 15926 validated
Graph edges computed

Schedule Intelligence Bridge

Bridge the gap between Level 3 planning and Level 4/5 construction progress. Live S-curves, automated EVM, quality-gated earned value — same-day data, not three-week-old reports.

Powered bySee the Bridge →
Schedule Intelligence Bridge
Bridge Active
Last sync: 12 sec ago
📋L3 Planning
WBS 3.2.4 — Piping Installation72%
WBS 3.2.5 — E&I Cabling58%
WBS 3.3.1 — Structural Steel91%
Critical Path Delay-8d
Sync
🏗L5 Construction
Pipe Spool Fabrication68%
Cable Tray Installation54%
Steel Erection Area 389%
QC Hold Points3
0.94SPI
1.03CPI
$186MEarned Value