From Engineering Deliverable to Commissioned System — In One Platform

Konnect xD Construction Management digitizes the full construction lifecycle for complex heavy engineering projects. Ingest native engineering files directly. Define scope down to the work step. Track progress tag by tag. Gate earned value on real inspections. Purpose-built for FPSO, shipbuilding, and industrial plant construction.

Part of the Konnect xD Ecosystem · Heritage: EasyPlant / EasyPiping · Full i18n (EN/中文)

[02]The Industry Problem

Construction Management on Mega-Projects Is Still Held Together by Spreadsheets

Engineering delivers.
Engineering delivers.
Thousands of isometrics, spool drawings, structural details — often as native CAD files (.idf, .pcf, CIS/2) that nobody bothers to parse. Instead, someone manually transcribes material take-offs into spreadsheets.
Construction starts.
Construction starts.
Supervisors track progress on paper forms, WhatsApp photos, or disconnected tools. Every discipline runs its own tracker. Nobody agrees on what "progress" means or how to weight it.
Project controls aggregates.
Project controls aggregates.
Hours spent manually combining discipline spreadsheets into a single dashboard that's already outdated by the time it reaches the project director's desk.
Engineering revises.
Engineering revises.
Rev B arrives. Did any of the changed items already have progress? How much rework is needed? Nobody knows until someone compares the spreadsheets cell by cell.

Konnect xD Construction Management was built to eliminate this entire pattern.

[03]Workflow

Seven Steps from Project Setup to Executive Dashboard

1

Create Project

Set up the project identity, area/zone hierarchy, and discipline taxonomy. Invite users by company type — Owner, Main Contractor, Yard, Subcontractor — each with appropriate role-based access.

2

Ingest Engineering Data

Upload native engineering files — Isogen .idf, SpoolGen .pcf, CIS/2, or MTO spreadsheets. The system auto-detects the format, parses the full entity graph (spools + welds + flanges in one pass), and populates the Tag Register.

3

Configure Scope Templates

Define the progress "language" for the project: work step sequences per tag type × discipline, with weightings that reflect real relative effort. Five-level activity hierarchy: Phase → Work Discipline → Work Class → Work Sequence → Work Step.

4

Commit Scope

Lock the scope of work to generate concrete, trackable work steps for every tag. The committed scope becomes the baseline. Per-tag overrides are available for exception handling.

5

Record Progress

Supervisors open the mobile interface, find their tags, and mark work steps as complete. Each entry is timestamped and attributed. Quality gates hold progress credit until inspections pass.

6

Manage Engineering Changes

When Rev B arrives, re-ingest the file. Automatic structural diff compares against the previous version — entities added, removed, or modified. Severity-coded items with progress impact trigger early warnings.

7

Review Dashboards

Project controls views real-time roll-ups by discipline, area, tag type, or project. S-curves show planned vs actual vs forecast. Drill down from any tile to individual tag progress.

[04]Capabilities

Six Pillars of Construction Intelligence

Skip the Spreadsheet

Skip the Spreadsheet

Ingest Isogen .idf files for piping isometrics, SpoolGen .pcf files for spool MTO, and CIS/2 for structural steel — directly into the construction scope. One file upload creates spools, welds, and flanges in a single pass. Re-ingestion of revised files triggers automatic structural diffing with severity-based impact analysis.

The Most Advanced Scope Definition System

The Most Advanced Scope Definition System

Five-level activity hierarchy — Phase → Work Discipline → Work Class → Work Sequence → Work Step — with configurable weightings, gate steps, and UOM matching. Scope templates generate trackable work steps for every tag. Per-tag overrides handle real-world exceptions.

Progress That Means Something

Progress That Means Something

Progress is only earned when inspections pass. Hold points block advancement until QC signs off. NDE sampling rates auto-escalate when a welder's repair rate exceeds configurable thresholds, and auto-de-escalate after consecutive passes.

Engineering Changes Don't Hide Anymore

Engineering Changes Don't Hide Anymore

Re-ingest a revised engineering file and instantly see what changed: new entities, removed entities, modified attributes. If entities with in-progress work are affected, the system creates change management incidents with side-by-side comparison and structured resolution workflows.

Connecting Planners and Builders

Connecting Planners and Builders

Export plan baselines from KXD Planning. Receive quality-gated field progress actuals back. One L3 schedule activity maps to 2,500 construction work items — and this platform closes that gap with a defined data contract and activity mapping.

Shop Floor to Handover

Shop Floor to Handover

Four discipline sub-apps — Piping (flagship), Structural Steel, Electrical, Instrumentation — each with domain-specific work steps, inspection types, and tracking logic. Piping alone covers shop fabrication through precommissioning.

[05]Flagship Discipline

Piping — From Spool Fabrication to System Handover

The piping sub-app inherits from the proven EasyPiping architecture and covers the full spool lifecycle:

ModuleWhat It Does
Spool TrackerShop & field activity steps with configurable weightings, step-progression dots, phase tracking
Weld ManagementJoint-level tracking with NDE results, defect classification (repairable/non-repairable), repair cycle audit
NDE Rate EngineAuto-escalation to 100% when repair rate exceeds threshold, auto-de-escalation after consecutive passes
Welder RegistryQualifications, performance analytics, repair rate tracking, WPS-Welder auto-matching
WPS RegistryRevision tracking, WPS-to-joint mapping by material/thickness/process
Test PacksPre-test checklists, test execution recording, approval workflow with digital signatures
Flange ManagementBolting specs, torque records (star pattern), integrity lifecycle: Open → Bolted → Torqued → Leak-Tested → Verified
Painting & InsulationShop 2-coat, field 2-coat, full 4-coat sequences, hot & cold insulation steps
AWP MethodologyCWA → CWP → FWP/IWP hierarchy with pre-condition gates for fabrication and installation release
Barcode/QR ScanningPhysical spool location tracking via label scanning

13 piping QC report templates — fit-up inspection, visual inspection, PMI, ferrite testing, PWHT, pressure test, borescope inspection, flange register, welding monitoring, material traceability — auto-populated from parent entities.

[06]Quality + Progress

Two Systems. One Truth.

Quality Review

QC Plans with activity-based checklists
Inspection scheduling, results recording, and sign-off
NCR register with classification and closure tracking
Punch list with photo upload and deficiency management
QC surveillance checklists per spool/joint

Progress Measurement

3-level weighted roll-up: Activity → Discipline → Project
Configurable weightage systems: manhours, quantities, unit rates
Cut-off snapshots for period reporting
S-curve dashboards: planned vs actual vs forecast
Earned Value Management: BCWS, BCWP, ACWP, SPI / CPI

Quality gates hold progress credit. NDE auto-escalation triggers on repair rate. Progress is only counted after inspections pass. The two systems enforce each other — quality is not optional.

[07]Industries

Purpose-Built for Complex Heavy Engineering

FPSO Modules

FPSO Modules

Modular topsides and hull fabrication with hundreds of concurrent spools, structural members, and equipment items across multiple work fronts. Shop fabrication through staging, transport, and field erection with continuous engineering revision management.

Shipbuilding

Shipbuilding

Block assembly, outfitting, and system commissioning programs. Multi-discipline coordination across hull, piping, E&I, and structural trades with AWP-driven work packaging and quality-gated milestones tied to classification society inspections.

Industrial Plant

Industrial Plant

Refinery turnarounds, petrochemical expansion, and greenfield EPC. DCMA-compliant scheduling (via KXD Planning integration), contractor-level progress reporting, and robust change management for engineering revisions that arrive mid-construction.

[08]Architecture

Platform Architecture

KXD Construction Management
├── App Backbone .............. WBS, disciplines, numbering, permissions, reports
│                               Native File Ingestion & Revision Intelligence Engine
├── App Modules
│   ├── Progress Measurement .. Roll-up, EVM, S-curves, quality-gated milestones
│   ├── Quality Review ........ QC plans, NCRs, punch lists, inspections
│   ├── Material Management ... MTO, procurement, warehouse tracking
│   └── Handover .............. System completions, RFSU, dossiers
└── Discipline Sub-Apps
    ├── Piping (flagship) ..... Spools, welders, WPS, test packs, flanges, AWP
    ├── Steel Structure ....... Members, bolt tensioning, erection sequences
    ├── Electrical ............ Cables, megger tests, termination schedules
    └── Instrumentation ....... Calibration, loop checks
FrontendReact 18 · TypeScript · Tailwind CSS v4 · shadcn/ui
BackendPython FastAPI · PostgreSQL
i18nEnglish · 中文
Native FilesIDF · PCF · CIS/2 · Excel/CSV
DeployDocker Compose · PostgreSQL 15

Ready to Run Construction the Way It Should Be Run?

We're inviting construction management teams to pilot Konnect xD on their own projects. Bring your engineering files, your spool registers, your weld data — and see how the platform transforms fragmented tracking into a single source of truth.