See What Your Schedule Is Really Telling You
Transform Primavera P6 schedules into actionable insights with AI-driven analytics, DCMA compliance scoring, and a direct bridge between Level 3 coordination schedules and Level 5 field execution. Purpose-built for FPSO, shipbuilding, and industrial plant construction.
Part of the Konnect xD Ecosystem · Enterprise SSO · Full i18n (EN/中文)
The L3 ↔ L5 Disconnect
The Planner's Office
The main contractor produces a Level 3 coordination schedule in Primavera P6. Engineering and procurement activities are detailed, but construction is high-level — “Install Piping Module 3.”
The Construction Yard
The construction subcontractor expands this to Level 4/5 — activities down to deck-level, material-type, and diameter ranges. One L3 activity maps to 2,500 trackable work items.
Nobody bridges this gap well:
Konnect xD Planning was built to close this gap.
Read the Schedule Intelligence Bridge Article →From Plan to Actionable Intelligence
Upload or Integrate
Drag-and-drop your Primavera P6 .xer file, or connect directly via our native P6 API integration. Instant validation confirms the data is parseable and flags any issues. The system extracts the full project structure — activities, WBS, resources, calendars, and relationships — in seconds.
Analyze
Automated analytics engines run across your schedule. DCMA 14-Point compliance. Float distribution analysis. Critical path validation. Resource loading heatmaps. Earned Value metrics. AI-driven optimization insights. All computed server-side — no manual setup.
Act
Explore your schedule through interactive dashboards. Compare versions to track changes. Share compliance reports with stakeholders. Bridge Level 3 plan baselines with Level 5 field progress. Identify risks before they reach the shop floor.
Four Pillars of Planning Intelligence
The Digital Spine
Native Primavera P6 XER parsing reconstructs the full project logic — WBS, activities, relationships, resources, and calendars. Snapshot versioning tracks schedule evolution. Compare baselines to detect scope creep and logic drift.
See What The Schedule Hides
Automated DCMA 14-Point compliance assessment grades schedule quality across logic density, float distribution, negative lags, and critical path integrity. Earned Value Management tracks CPI and SPI with S-Curve visualization using real schedule data.
Intelligence, Not Just Data
Server-side AI analyzes your schedule and surfaces optimization recommendations, risk identification, and resource visibility. Powered by Google Gemini — every insight comes with a confidence score so your team knows where to focus first.
Connecting Planners and Builders
Export plan baselines to construction management. Receive quality-gated field progress back. Compute a complete Earned Value picture where BCWP is only earned when work steps are completed and inspections pass. EVM grounded in physical reality, not estimates.
Key Features
Level 3 Plan ↔ Level 5 Progress
The Konnect xD ecosystem solves the industry's hardest integration problem: natively interoperating the main contractor's coordination schedule with the subcontractor's field progress via our Construction Management app.
Plan → Construction Management
Construction Management → Plan
Quality-Gated EVM
| Metric | Source |
|---|---|
| BCWS (Planned Value) | From baseline schedule + resource loading |
| BCWP (Earned Value) | Field progress × budgeted weight — quality-gated |
| SPI / CPI | Computed from real data, not estimates |
The key insight: earned value is real when progress is only counted after inspections pass. This is the difference between schedule fiction and construction reality.
Purpose-Built for Complex Heavy Engineering
FPSO Modules
Modular construction yards managing hundreds of concurrent fabrication activities across topsides and hull modules. Where schedule integrity directly impacts sailaway dates and offshore hookup windows.
Shipbuilding
Complex vessel programs with interlocking block assembly sequences, outfitting tracks, and system commissioning. Where resource leveling across multiple ships in the same yard is critical.
Industrial Plant
Refinery turnarounds, petrochemical expansion, and greenfield EPC projects. Where DCMA compliance and earned value accuracy determine contractor payments and project controls credibility.
Enterprise-Grade Architecture
Production-ready deployment.
Ready to See What Your Schedule is Really Telling You?
We're inviting project controls teams to pilot Konnect xD Planning on their own projects. Full access, direct feedback channel, and a seat at the table as we shape the future of Planning Intelligence.